624775 Nordyne Gas Valve – 24 VAC, 3.5″ WC, Natural Gas, ½″ NPT
624775 Nordyne Gas Valve – 24 VAC, 3.5″ WC, Natural Gas, ½″ NPT
This OEM gas valve provides reliable first-stage control for Nordyne and private-label furnaces. It operates on 24 VAC, delivers 3.5″ water column manifold pressure, and features a ½″ NPT inlet/outlet. Its robust diaphragm and solenoid coil ensure consistent ignition sequencing in M-series and G-series units.
Cross-Reference Part Numbers
| OEM Part Number | Description |
|---|---|
| 624775 | Original Nordyne 1st-stage gas valve |
| 624775R | Updated Nordyne superseding part |
| VR8215S2310 | Honeywell VR8215S series 1st-stage gas valve |
Compatibility
-
Nordyne furnace models: M2, M3, G3, G4, G5, G6, UTEC series
-
Private-label units by Maytag, Miller, Broan, Frigidaire, Gibson, Intertherm, Partners Choice
-
Suits natural-gas applications requiring 3.5″ WC manifold pressure and ½″ NPT connections
Technician Notes
-
Always shut off gas supply and relieve line pressure before service.
-
Verify incoming gas pressure meets manufacturer’s spec (typically 5–7″ WC).
-
Check coil resistance at 24 VAC; expect approximately 15 Ω.
-
Use a leak-detection solution on all fittings and joints after installation.
-
Photograph or diagram existing wiring before disconnecting valve leads.
-
Confirm proper orientation: inlet port taps the supply line, outlet port feeds manifold.
-
Torque ½″ NPT fittings to 10–15 ft-lb; avoid over-tightening the valve body.
-
Apply 24 VAC to the coil and listen for a crisp “click” indicating valve seating.
-
Monitor manifold pressure at valve outlet under load—aim for steady 3.5″ WC during burner operation.
-
Run multiple ignition cycles to ensure diaphragm integrity and no sticking.
Additional Resources
-
Download the OEM gas valve technical datasheet (PDF)
-
Access a printable cross-reference sheet covering Nordyne and private-label gas valves
-
Watch our step-by-step video guide on first-stage gas valve replacement
-